What Does a Reserve Study Cost? Estimator by State

Last verified: October 10, 2026 · See updates

Enter your state, your annual operating budget and your unit count. The tool applies the two cost anchors national firms publish, prices the do-it-yourself route in dollars and in board hours, and gives the figure boards need most: what it costs per unit, and per unit a year across the cycle your state sets.

What you get: whether your state requires a study and who its statute says may prepare it, with the citation and source link; the published cost anchors applied to your own budget; the do-it-yourself route priced at $499 plus the 20 to 40 hours the provider publishes; and every figure divided by your unit count.

What it does not do: it does not quote you. No provider publishes a price list for professional studies, and no government survey of reserve study fees exists. Everything here is published anchors applied to your numbers, and the page says which anchor each figure comes from.

1. Your association

Mississippi has no row in our state table yet, so it is not in this list.

Six of the 12 states that require a study limit the duty to one regime or to a size, and the tool says so when your answer changes.

2. Your numbers

The figure your budget adds up to for the year, in dollars. Use the operating budget, not the reserve balance.

A first study is a Full study. Later ones are updates, and the two anchors price updates as a share of a Full study.

Why the percentage rule breaks for a small association

Association Reserves publishes a rule of thumb in its own cost article: a Full reserve study typically costs less than 1 percent of the association's annual budget. Reserve Advisors publishes a market range in its own cost article: as little as $1,000 or as much as $7,500 or more. Apply both to a small association and they disagree.

One percent of a $60,000 annual budget is $600. The lowest figure in the published market range is $1,000. The two anchors cross at a $100,000 annual budget, which at the $401.67 a unit a month our budget workbook uses is about 21 units. Below that, the percentage understates what a board will be quoted, and the $1,000 floor is the number to plan against.

The reason is the shape of the work. A site inspection, a component list and a 30 year funding plan take a minimum number of hours whatever the property, so the fee has a floor that a percentage of a small budget falls through. That is why the same study costs a 12 unit association far more per unit than a 300 unit one, and it is the single strongest argument for buying a Full study less often and doing disciplined updates in between, where your state allows it.

Who the statute says may prepare the study

This is the question that decides whether the $499 kit is open to you. Twelve of the 49 states in our table require a study. Eight of those name who may prepare it, and Utah is the only one that says the board may prepare the analysis itself.

Reserve study duty, cycle and preparer in the 12 states that require one. Every cell restates the reserve study column of our 49-state comparison table, with its citation and verification date.
StateCycleWho may prepare itScope limitSource
California 3 years The cited sections name no preparer No scope limit stated in the cell we publish. Cal. Civ. Code sec. 5550 read California at the state source
verified 2026-08-14
Delaware 5 years Qualified person named by the statute Condominiums and cooperatives created on or after September 30, 2009. Planned communities have no study requirement. 25 Del. C. sec. 81-205(a)(14); definition at sec. 81-103(40) read Delaware at the state source
verified 2026-09-13
Florida 10 years Credentialed specialist, engineer or architect Condominiums of 3 or more habitable stories (structural integrity reserve study). Fla. Stat. sec. 718.112(2)(g) read Florida at the state source
verified 2026-08-27
Hawaii 3 years Independent preparer or professional Condominiums. The planned community chapter has no reserve section. Haw. Rev. Stat. sec. 514B-148; ch. 421J read Hawaii at the state source
verified 2026-07-27
Maryland 5 years Independent preparer or professional Homeowners associations are covered where the component repair or replacement cost is at least $10,000. Md. Real Prop. secs. 11-109.4, 11B-112.3; Corps. and Assns. sec. 5-6B-26.1 read Maryland at the state source
verified 2026-09-01
Nevada 5 years Qualified person named by the statute No scope limit stated in the cell we publish. NRS 116.31152 read Nevada at the state source
verified 2026-07-31
New Jersey 5 years Credentialed specialist, engineer or architect Associations whose capital assets are under $25,000 are exempt. N.J.S.A. 45:22A-44.2 (as amended by P.L. 2025, c.132) read New Jersey at the state source
verified 2026-09-01
Oregon No interval in the cited sections The cited sections name no preparer No scope limit stated in the cell we publish. ORS 94.595; ORS 100.175 read Oregon at the state source
verified 2026-09-01
Tennessee 5 years Credentialed specialist, engineer or architect Condominiums only, where the aggregate replacement cost of the common elements exceeds $10,000. A condominium created before January 1, 2009 is outside it unless it adopted the act in full. Tenn. Code Ann. secs. 66-27-403(g), 66-27-203; Acts 2023, ch. 205; scope at sec. 66-27-202(a) read Tennessee at the state source
verified 2026-09-21
Utah 6 years The board may prepare it itself No scope limit stated in the cell we publish. Utah Code sec. 57-8a-211 (condos sec. 57-8-7.5) read Utah at the state source
verified 2026-07-27
Virginia 5 years The cited sections name no preparer No scope limit stated in the cell we publish. Va. Code sec. 55.1-1826 (condo parallel sec. 55.1-1965) read Virginia at the state source
verified 2026-08-01
Washington 3 years Independent preparer or professional No scope limit stated in the cell we publish. RCW 64.90.545-64.90.555; 64.90.365 read Washington at the state source
verified 2026-09-01

Six more states set a funding or disclosure rule in place of a study: Colorado, Connecticut, Illinois, Michigan, Minnesota and Ohio. Michigan's administrative rule sets a floor of at least 10 percent of the annual budget. Minnesota asks that reserve adequacy be reevaluated at least every third year. The remaining 31 states require nothing, which does not make the study optional in practice: your declaration may require one, a lender may ask for one, and the board's duty of care does not disappear because the legislature is silent.

Where every figure on this page comes from

Five sources, each read at the publisher's own page on October 10, 2026. No figure is estimated, averaged or carried from memory.

  • The percentage rule of thumb. Association Reserves, How Much Does It Cost to do a Reserve Study?. A Full study typically costs less than 1 percent of the annual budget. An update with a site visit typically costs 50 to 80 percent of a Full study. An update with no site visit costs 25 to 50 percent. Those are the firm's words for its own three levels of service.
  • The market range and the time cost. Reserve Advisors, What to Expect When Budgeting for a Reserve Study. A study can cost as little as $1,000 or as much as $7,500 or more. A board doing the work in house can expect to invest, on average, 20 to 40 hours. The firm publishes no price for its own service.
  • The do-it-yourself kit. Association Reserves, Do-it-Yourself Reserve Study Kit, $499 flat with delivery within a week. The vendor states the kit does not include revisions or access to uPlanIt. Its uPlanIt funding tool is $399 a budget season, free with any professional study, with seasonal access and sales final.
  • Reserve planning software. PRA System publishes $500 for the initial licence plus $150 a year at its smallest tier, with the next band starting at 501 units. ReserveDeck publishes a Starter tier at $79 a month, or $790 a year billed annually, for one seat and up to five properties, with a 7 day refund window.
  • The state requirements. Our own 49-state comparison table, which carries the statute, the state source link and the verification date for every row. The structured version of the reserve column is free to download and reuse under CC BY 4.0: reserve-study-requirements.json (49 states).

Three limits, stated plainly:

  • These are anchors, not quotes. Both percentage figures are rules of thumb a provider publishes about its own work. Your quote will turn on the complexity of the property, its size, how far the inspector travels, the time of year and how fast you need it, which is the list Association Reserves itself gives.
  • No national dataset exists. We looked for a government survey, an industry benchmark and a trade body figure, and found none that publishes reserve study fees. If you know of one, tell us and we will read it and publish what it says.
  • Whether the kit satisfies your statute is open. The $499 kit is calculated by a firm of reserve specialists from a component list the board builds. Whether that meets a statute requiring a credentialed professional to conduct the study is a question for the firm and for a community association attorney in your state. We do not answer it here.

Questions boards ask about reserve study cost

Does my state require a reserve study?

Twelve of the 49 states in our comparison table require one: California, Delaware, Florida, Hawaii, Maryland, Nevada, New Jersey, Oregon, Tennessee, Utah, Virginia and Washington. Six more set a funding or disclosure rule in place of a study: Colorado, Connecticut, Illinois, Michigan, Minnesota and Ohio. The remaining 31 require nothing, so the duty comes from your declaration and bylaws and from the board's general duty of care. Several of the 12 carry scope limits that decide whether the duty reaches you at all. Florida's reaches condominiums of 3 or more habitable stories. Delaware's reaches condominiums and cooperatives created on or after September 30, 2009. Tennessee's reaches condominiums whose common elements exceed $10,000 of aggregate replacement cost, and leaves out a condominium created before January 1, 2009 unless it adopted the act in full.

Can our board do the reserve study itself?

It depends on the state, and this is the question that decides whether the $499 kit is an option. Utah is the only state in this tool whose statute says the board may prepare the analysis itself. Eight of the other 11 states that require a study name who may prepare it. Florida, New Jersey and Tennessee require a credentialed reserve specialist, a licensed engineer or a licensed architect. Hawaii, Maryland and Washington require an independent preparer or professional. Nevada requires a qualified preparer and Delaware an engineer, architect, contractor or other qualified person. California, Oregon and Virginia set the study and the cycle and name no preparer qualification in the sections our table cites.

What does a reserve study cost?

No provider publishes a price list for professional studies, and no government survey or national dataset of reserve study fees exists. Two national firms publish anchors instead. Association Reserves gives a rule of thumb in its own cost article: a Full reserve study typically costs less than 1 percent of the association's annual budget, an update with a site visit 50 to 80 percent of a Full study, and an update with no site visit 25 to 50 percent. Reserve Advisors publishes a market range in its cost article: as little as $1,000 or as much as $7,500 or more. Both were read at the firms' own pages on October 10, 2026. Neither is a quote for your association.

Why does the percentage rule give a number below the market floor?

Because a professional study has a price floor that a percentage does not. One percent of a $60,000 annual budget is $600, and the lowest figure in the published market range is $1,000. The two anchors cross at a $100,000 annual budget. Below that, the percentage rule understates what a small association will be quoted, and the floor is the number to plan against. This is the arithmetic behind a point boards hear often: a study costs a small association more per unit than a large one, because the work has a minimum size whatever the property.

Is the $499 do-it-yourself kit a reserve study?

Association Reserves sells a Do-it-Yourself Reserve Study Kit at $499 flat with delivery within a week. The board builds the component list and the firm calculates the fund strength and the funding plan from it. The vendor states the kit does not include revisions or access to its uPlanIt funding tool, which is $399 a budget season on its own and free with any professional level of service. Whether a kit built on a board's own component list satisfies a statute that requires a credentialed professional to conduct the study is not something we can answer. Put that question to the firm and to a community association attorney in your state before you buy on that basis.

What does doing it ourselves cost in time?

Reserve Advisors publishes a figure in its cost article: a board that does an in-house study can expect to invest, on average, 20 to 40 hours. That is the cost most boards leave out. At 30 hours, a volunteer treasurer is giving up most of a working week, and the hours fall on the one or two people who understand the components. Reserve planning software carries its own price: PRA System publishes $500 for the initial licence plus $150 a year at its smallest tier, and ReserveDeck publishes a Starter tier at $79 a month, or $790 a year billed annually.

Next step

Before you ask for a single bid, run our reserve contribution calculator. It is a straight line estimate and not a study, and it takes an evening, but it tells you whether your current contribution is anywhere near the mark. Then read the reserve study guide for small associations, which sets out what the two halves of a study contain and what a small board can do between studies. Put the cycle your state sets into the annual operating calendar so the next treasurer inherits the date, and budget the fee as a line item rather than a surprise.

When you do go out for bids, ask every firm the same three questions, because they are where the price differences sit: which level of service is this, what is in the scope of work and how many components does it cover, and is travel inside the fee or billed on top. Our guide to audits, reviews and compilations has a checklist of the same shape for the engagement letter.

Educational tool, not reserve study, engineering, legal or accounting advice. It applies cost figures providers publish to the numbers you enter, and restates the reserve study column of our state table. It does not inspect your property, value a component or produce a funding plan, and it cannot tell you whether a given route satisfies your statute or your declaration. A reserve study is the document a lender, a buyer and in 12 states a statute will ask for. Have one prepared by someone qualified to prepare it.